1. Maruti Suzuki India Ltd,Gurgaon plant
Project description -100000 CMH vehicle smoke exhaust system in Assembly 2 ,MSIL,Gurugram
Project description – 50000 CFM Co2 fumes exhaust system in Weldshop
2. Fortis Hospital , Mohali
Smoke extraction system for 4 blocks(total 12 floors and 150000 CFM )
Replacement of OT and ICU AHU s(Total 08 Nos.)totalling to about 100000 CFM capacity
3. A-Paul Software Systems Pvt.Ltd., IMT , Faridabad
Project description – 36000 CFM indirect evaporative cooling based air washer system and with related
air distribution system to maintain clean and cool environment on shop floor. The company is into
manufacturing of display boards and IOT based controllers for Indian Railways
4. Minda Industries (Rinder Division) Bahadurgarh, Haryana
Project Description-
(a) Paint booth shower system along with exhaust system
(a) Improvement and recommissioning of motorized fire dampers of complete HVAC system and its
interlinking with fire alarm system
(b ) PLC supply and commissioning for operation and controlling of complete HVAC system and oven
for hard coat area
( c ) SITC of water cooled scroll chiller (Daikin make ) 40 TR capacity along with AHU for Hard coat area
5. Ramco Steels Pvt .Ltd ., IMT Faridabad- Welding fume exhaust system
6. Genesis Global School, Noida
Aircooling and exhaust system for Laundry
7. SRF Industries Ltd .,Bhiwadi Plant
Automatic Fresh air ventilation and fume exhaust system for Chemical storage cold room
8. Dr.Lal Path Labs Ltd. , Regional Testing Laboratory , Sector-18 , Rohini , Delhi
Project Description – (a) AHU for Molecular diagnostic test lab ( b ) Fume exhaust system
( c ) Revamping of HVAC system for TLA (Siemens testing machines)
9. Fortis Hospital and Research Institute , Gurugram
Project description –(a) HVAC work for LDR and NICU (b ) SITC of 12 Nos. FCUs with related piping and
ducting for doctor rooms and patient rooms (c) Airconditioning of Lasic (Eye) OT room (d ) SITC of 12
Nos. FCUs in OPD Rooms
10. Amul Dudhmansagar Dairy , Manesar
Project Description-(a) Liftwell pressurization in accordance with fire norms
(b ) Dahi curing area ventilation and exhaust system
11. Barco Electronics India Ltd., Noida
Project Description –(a) Low side piping and structural work of 2 X 150 TR cooling towers
(b )HVAC plant room piping modification
12. Castle Barbeque , Connaught Place , New Delhi ( A Unit of Paprika Hospitality ) – Airconditioning of
restaurant with Bluestar make ductable AC ( 22 TR ) and kitchen ventilation and exhaust system
Project-2024
Devagya Engineering is pleased to share that as part of our continued relationship with Fortis Hospital, Mohali,we have successfully completed a retrofit project of replacement of 05 Nos. Air Handling units with a total capacity of 100000 CFM.The project involved latest technology Edgetech make AHUs and other energy saving features like replacement of old starter panels with VFD panels.These AHUs cater to critical areas like Cath labs and ICUs and were installed in very tight timelines. The projected energy savings to Fortis after replacement is approx. 90000 KWH per year.The project showcases our expertise in executing Retrofit projects in 24*7*365 applications.